The Trap Door
December 6, 2003

<= Previous: The Fireplace      |      Next: The Sifter =>

Just to the left of the refrigerator in the kitchen, there is a door that leads to the laudry/storage room. This will have ample shelves to store our 'extra' stuff of serve as a GREAT pantry/wine cellar. In the floor will be a trap door that will lead into the warm 'basement'. It will be nearly 4 feet wide to give better access if we wish to put a new water storage tank in. We may end up putting a water tank that will store water directly from the well here, but the main purpose is to provide an insulated space to place tanks that will store heated water that will be used in the infloor heating system, the ramps of the sunken carport and the reverse flor anti-freezing system.

This door may be rather heavy after it is built, so I have designed a caounter balance that will be located on the wall just inside the door. When the door is all the way closed down, the balance will of course be at the top. There will be a pin or catch that will hold the weight up, keeping the door closed securely. Releasing the catch or pin will put weight on the door and idealy a few ounces of force should be able to open it.

To install this door, I had to re-design the floor joists a bit. This can be seen in the lower left corner of the final sketch.

<= Previous: The Fireplace      |      Next: The Sifter =>


Mystic and Westbrook Connecticut
Click here for more information

Berm House # 1:
Property Layout (10-17-2003)
Index of Sketches (11-30-2003)
Exterior of the Home (12-02-2003)
The Lot (12-04-2004)
Tree Sizes (12-05-2003)
Cut Stone (12-07-2003)
The Floor Plan (12-04-2003)
A Look Inside (12-04-2003)
Rafters and Beams (12-05-2003)
The Fireplace (12-06-2003)
The Trap Door (12-06-2003)
The Sifter (12-12-2003)
Solar Water Heater (12-19-2003)
Berm House # 2:
Sketch of the Hallway (10-20-2003)
Hall Dimensions (10-20-2003)
Room Dimensions (10-20-2003)
Floor Plan (10-20-2003)
Sketch of the Front View placement of rooms (10-20-2003)
Sketch of the Back view placement of rooms (10-20-2003)
Solar lighting (11-09-2003)
Frozen Pipe problems (11-15-2003)

Site Index:
Home
Add to or view our Bulletin Board

How Much Did it Cost?
News and Progress (09-27-2004)
Recommended Reading and Book Reviews (3)
View our Library of Links
Why?

Thoughts and Ponderances:
The Simple Life

 

The first place: (or The Yurt)
Photos of the Progress (11-29-2004)
Yurt? What is a Yurt? (09-27-2004)
The Front View (09-28-2004)
Building Process - Part 1 (06-29-2005)
Building Process - Part 2 (06-29-2005)
Building Process - Part 3 (09-28-2004)
How Much is that Cabin? (03-12-2007)

Last Updated on
March 12, 2007

This web site is designed and maintained by the team at Sand Dollar Digital Design © October 2003
Report abuses and other comments about this site to Sand Dollar Digital Design